首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Construction cost control is a complex system engineering. The traditional controlling method cannot dynamically control in advance the construction cost because of its hysteresis. This paper proposes a computer simulation based construction cost integrated control method, which combines the cost with PERT systematically, so that the construction cost can be predicted and optimized systematically and effectively. The new method overcomes the hysteresis of the traditional systems, and is a distinct improvement over them in effect and practicality. Project (43220205*29817) supported by Cao Guang-Biao High-Tech. Development Foundation of Zhejiang University  相似文献   

2.
浅谈工程造价的预结算审核   总被引:1,自引:0,他引:1  
工程造价的预结算审核是合理确定工程造价的必要程序及重要手段。通过对预、结算进行全面、系统的检查和复核,及时纠正所存在的错误和问题,使之更加合理地确定工程造价,达到有效地控制工程造价的目的,保证项目目标管理的实现。  相似文献   

3.
发展装配式建筑是促进传统建造方式转型升级的重要途径。装配式建筑成本控制是当前装配式建筑发展中关注的重点和热点。通过文献分析对比装配式混凝土建筑(PC建筑)和传统现浇建筑的成本的差异性,系统归纳了影响PC建筑成本的主要因素,分析降低PC建筑成本的措施和方法,提出我国PC建筑成本控制的建议。  相似文献   

4.
基于价值管理的建筑工程造价的控制策略研究   总被引:2,自引:0,他引:2  
价值管理是一种能够实现项目增值并降低建设和使用成本的有效工具,在建筑工程中应用价值管理,能够提高建设项目的功能和控制工程造价,本文在分析价值管理基本概念及方法基础上,提出了在工程建设各阶段控制工程造价的方法和措施。这对合理确定工程造价,确保工程造价的准确性起到重要作用。  相似文献   

5.
采用层次分析法(AHP)对成本控制对策进行全面分析,并通过建立施工项目成本控制体系模型和对其进行一致性检验,总结出各种成本控制措施的重要权值,得出降低成本和科学排序的措施参数。  相似文献   

6.
李月玲  李毅 《钦州学院学报》2006,21(6):102-104,107
建筑基坑边坡稳定方法有人工支护稳固边坡、模板支撑土体、土钉墙喷锚结构、挡土桩墙结构等形式,各类形式在施工技术、工程造价及应用方面各有优劣.制定建筑基坑边坡稳定支护方案时须因时、因地、因项目具体情况,考虑而选取不同的施工方案.  相似文献   

7.
研究了状态和控制都滞后的不确定连续时滞系统的状态反馈保性能控制器设计.利用Lyapunov稳定性理论,提出了状态反馈保性能控制器存在的充分条件,并采用线性矩阵不等式处理方法,给出了保性能控制律的构造方法.  相似文献   

8.
从信息技术在工程建设领域中的应用这个角度来分析,在设计阶段传统造价控制方式存在一定的问题,从技术角度进一步分析了产生这些问题的原因,提出了在设计阶段从技术上有效地控制造价的新方式——基于BIM的造价管理模式,并进一步探讨了这种模式的具体实现方案.  相似文献   

9.
Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the construction time-cost-quality tradeoff for the planning or design phase, built on static empirical data. However, due to its intrinsic uncertainties, rockfill dam construction is a dynamic process which requires the tradeoff to adjust dynamically to changes in construction conditions. In this study, a dynamic time-cost-quality tradeoff (DTCQT) method is proposed to balance time, cost, and quality at any stage of the construction process. A time-cost-quality tradeoff model is established that considers time cost and quality cost. Time, cost, and quality are dynamically estimated based on real-time monitoring. The analytic hierarchy process (AHP) method is applied to quantify the decision preferences among time, cost, and quality as objective weights. In addition, an improved non-dominated sorting genetic algorithm (NSGA-II) coupled with the technique for order preference by similarity to ideal solution (TOPSIS) method is used to search for the optimal compromise solution. A case study project is analyzed to demonstrate the applicability of the method, and the efficiency of the proposed optimization method is compared with that of the linear weighted sum (LWS) and NSGA-II.  相似文献   

10.
铁磁材料的磁特性常用磁滞回线来表示,它是对称于坐标原点的闭合曲线。测量磁滞回线的方法很多,根据示波器X—Y显示功能的测量方法,利用Simulink生成仿真电路,对磁滞回线进行仿真。与传统的实验室测量操作相比,可以观察到磁化和去磁过程中形成的闭合曲线的全过程,仿真的操作过程简单,仿真的结果较好。  相似文献   

11.
与传统的频率变换器相比,矩阵变换器能够实现功率的双向流动,驱动电机四象限运行,输入端功率因数可调节为1,输出电压幅值、相位和频率可独立调节等优点。由于矩阵变换器的一般控制算法为开环控制,使当输入存在干扰时,输出电压的质量就会受到影响。采用一种基于电压滞环控制的闭环控制策略,对电压进行闭环控制,并在Matlab环境下建立仿真模型,仿真结果表明该控制算法是可行和有效的。  相似文献   

12.
熊伟  李爱彬 《煤炭高等教育》2011,29(6):34-35,41
本文突破现行科研项目成本计算方法的局限,将全成本管理理论引入高校科研项目成本管理中,系统地构建了高校课题制科研项目全成本核算体系,提出了建立科研经费全成本核算动态控制机制,在项目的申报、审批、预算、过程控制、验收结题等各个环节实现财务信息的有效共享。这一研究是对高校课题制科研项目全成本核算研究领域的理论发展的深化和推进,对实践具有重要的指导意义。  相似文献   

13.
论述了建设工程造价全过程控制与管理,分析了建设过程中的投资决策、设计、招投标、施工以及竣工决算等阶段对工程造价进行有效控制和管理的方法与措施,以控制建设工程造价核定的限额,确保投资控制目标实现。  相似文献   

14.
高校财会专业计算机审计课程建设探讨   总被引:1,自引:0,他引:1  
随着会计电算化的发展,传统审计方法受到了巨大挑战,计算机审计成为变革传统审计思路和方法的出路所在。由于目前既懂计算机又懂审计的人才缺口较大,高校承担起系统培养复合型审计人才的重任。针对高校课程设置、师资、教学内容等问题,本文对高校计算机审计课程建设进行了探讨。  相似文献   

15.
我国传统建设项目造价管理方法的主要缺陷表现在建设项目造价管理的机制问题、建设项目造价确定的方法问题、建设项目造价控制的方法问题。从20世纪80年代以来,我国在从传统的建设项目造价管理范式向现代建设项目造价管理范式转换,而造成这种转换的原因有传统的范式已不能适应社会发展的需要、新范式的逻辑空间和理论与方法更优越、现代项目管理科学的发展,既得利益格局的变化等。  相似文献   

16.
电流滞环跟踪PWM控制技术能较好地得到三相对称正弦波电流,以电流滞环跟踪PWM控制器为内环,转速外环调节器选用PI调节器,建立异步电动机双闭环调速系统.建立系统主电路及控制电路进行仿真模型,主电路由异步电动机模块、电动机测量单元模块、逆变器模块、直流电源、负载模块等组成,控制电路由转速给定信号、转速调节器、电流给定信号及电流滞环跟踪控制器等组成.仿真得到电流、转速及电磁转矩曲线,验证了方法的有效性.  相似文献   

17.
作业成本法在现代物流成本管理中的应用研究   总被引:6,自引:0,他引:6  
降低企业物流成本被认为是企业的第三利润源泉。而目前,在传统的成本核算方法下,我国企业的物流成本就像一座冰山,与实际发生值相差甚远。因此运用作业成本法,建立物流成本计算和控制的管理系统,才能真正降低企业物流成本。  相似文献   

18.
施工项目成本控制是通过控制工程直接成本、降低间接成本、控制质量成本、合理缩短工期及增加预算收入等途径来实现。  相似文献   

19.
从一般水利水电施工企业的实际情况出发,阐述了施工企业造价管理和造价控制标准、方法、过程以及为何提高造价管理、造价控制水平、提高投标成功率的措施与示法。  相似文献   

20.
成本控制应贯穿于施工项目从报价中标到竣工验收的全过程。严格审查各项费用是否符合标准,通过计算实际成本和计划成本的差异进行分析,对项目施工管理进行指导、监督、调节和限制,以保证成本目标的实现。其目的在于降低项目施工成本,提高社会经济效益。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号