首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
教育   1篇
  2009年   1篇
排序方式: 共有1条查询结果,搜索用时 15 毫秒
1
1.
With the characteristics of diversity, randomness, concurrency and decomposability, tasks in manufacturing field are very complicated, and so manufacturing grid(MG)should have considerable flexibility to deal with this problem. With the definition of node and arc, MG structure is converted into a small-world network. Given construction cost constraint, the problem of shortest task waiting time is transformed into the constrained optimization problem, and a corresponding flexibility analysis model based on average path length(APL)is proposed, and the premise of arc-length and node-distance are defined. The results of application example show that the analysis model is effective.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号