首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
教育   2篇
  2008年   1篇
  2002年   1篇
排序方式: 共有2条查询结果,搜索用时 15 毫秒
1
1.
一体化电子式电流电压互感器研究   总被引:7,自引:1,他引:7  
A high-performance current and voltage measurement system has been developed in power system.The system is composed of two parts:one current measurement element and one voltage measurement element.A Rogowski coil and a capacitive voltage divider are used respectively for the line current and voltage measurements.Active electronic components are used to modulate signal,and power supply for these components is drawn from power line via an auxiliary current transformer,Measurement signal is transmitted y optical fibers,which is resistant to electromagnetic induction and noise,With careful design and the use of digital signal processing technology,the whole system can meet 0.5% accuracy for metering and provides large dynamic range coupled with good accuracy for protective relaying use.  相似文献   
2.
This paper describes a prototype power delivery system developed for high voltage electronic current transformer (ECT) that uses laser light to transfer power to and communicates with the primary converter. The design is based on optical-to-electrical power converters, solid-state diode lasers and optical fibers. Command signals are transmitted via the same up-fiber used to send power from secondary power supply to primary converter. The upward data transmission is completed during the brief interruption of power delivery without affecting steady power-supply. A simple comparator added to the primary converter can take the command data. Experimental results show that the fibers can provide reliable up-link for data transmission at 200 kb/s from the secondary to the primary converter. Based on the delivery system, the secondary converter can control three auxiliary channels to provide additional information. These monitoring channels are used in a time-multiplexing mode to provide information about the operation temperature, voltage and current at the remote unit for monitoring the ECT. This preventive maintenance or built-in test can increase reliability by giving early warning for necessary maintenance request.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号