倮裹钢管混凝土拱桥施工控制 |
| |
引用本文: | 薛新枝,张向东.倮裹钢管混凝土拱桥施工控制[J].石家庄铁路工程职业技术学院学报,2006(3). |
| |
作者姓名: | 薛新枝 张向东 |
| |
作者单位: | 中铁二十一局三公司 陕西咸阳712000(薛新枝),石家庄铁路职业技术学院 河北石家庄050041(张向东) |
| |
摘 要: | 结合钢管混凝土拱桥施工控制的实例,探讨钢管混凝土拱桥施工控制的主要内容与控制方法,对监控结果进行分析,并对施工中需注意的事项提出几点建议。
|
关 键 词: | 钢管混凝土 拱桥 施工控制 |
Construction control of Luoguo Concrete Filled Steel Tubular Arch Bridge |
| |
Authors: | Xue Xinzhi Zhang Xiangdong |
| |
Institution: | The 3rd Engineering Company of the 21st China Railway Construction Bureau1) Xianyang Shaanxi 712000 Shijiazhuang Institute of Railway Technology2) Shijiazhuang Hebei 050041 China) |
| |
Abstract: | With the living example, the paper explores the main contents and the controlling methods of the construction control of concrete filled steel trbular, analyses the monitoring result, and proposes some solutions to attention of construction. |
| |
Keywords: | concrete filled steel tubular arch bridge construction control |
本文献已被 CNKI 等数据库收录! |