首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A study of optimal switching problem in limited-cycle with multiple periods
Authors:Jing Sun  Hisashi Yamamoto  Masayuki Matsui
Institution:1. Graduate School of Engineering, Nagoya Institute of Technology, Gokiso-cho, Showa-ku, Nagoya, Aichi, 466-8555, Japan
2. Department of System Design, Management Systems Engineering, Tokyo Metropolitan University, 6-6 Asahigaoka, Hino, Tokyo, 191-0065, Japan
3. Department of Informatics, Graduate School of Informatics and Engineering, The University of Electro-Communications, 1-5-1 Chofugaoka, Chofu-shi, Tokyo, 182-8585, Japan
Abstract:In a social system or production line, the restrictions of the cost and the due-time exist in each period. Generally, whether these restrictions are satisfied is dependent not only on the risks of this period, but also on the risks generated beforehand. We consider controlling the production process by switching the processing rate to a faster one at a given period. This paper deals with the optimal switching period to minimize the total expected cost of the production process. We first propose the optimal switching period model, and then the mathematic formulation of the total expectation is presented. Finally, the policy of optimal switching period is investigated in detail by numerical experiments.
Keywords:
本文献已被 CNKI 维普 万方数据 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号