斜拉桥施工过程中的多索力调整
引用本文:张彦伦.斜拉桥施工过程中的多索力调整[J].中国科技信息,2012(18):68-69.
作者姓名:张彦伦
作者单位:华南理工大学土木与交通学院,广州,501640
摘    要:在斜拉桥的施工监控过程中,当主梁标高和施工索力出现了偏差,对主梁应力与成桥线形造成不利的影响时,有必要采用斜拉桥施工过程中的多索力调整来消除此误差。本文结合某斜拉桥实例来阐述超重系数的确定、多索力调整的方案制定及索力优化的方法等。

关 键 词:斜拉桥  超重系数  多索力调整

Multi-cable-force Adjustment in a Cable-stayed Bridge During Construction
Zhang Yanlun.Multi-cable-force Adjustment in a Cable-stayed Bridge During Construction[J].CHINA SCIENCE AND TECHNOLOGY INFORMATION,2012(18):68-69.
Authors:Zhang Yanlun
Institution:Zhang Yanlun School of Civil Engineering and Transportation,South China University of Technology,Guangzhou 510640,P.R.China
Abstract:When a great amount of deviation of the elevation of main girders or cable force emerged during construction it would have a bad effect on the stress of main girder and the elevation in completion state of bridge.Therefore,we need to make adjustments to the multi-cable-force of cable-stayed bridge which is under construction.This paper presents the method for identification of the main girder segment weight,,as well as the schemes of multi-cable-force adjusting for this cable-stayed bridge.
Keywords:cable-stayed bridge  overweight parameter  multi-cable-force adjustment