首页 | 本学科首页   官方微博 | 高级检索  
     检索      

乌牛新闸混凝土灌注桩施工管理措施
引用本文:刘娟娟,夏有利.乌牛新闸混凝土灌注桩施工管理措施[J].长江工程职业技术学院学报,2014,31(3):7-9.
作者姓名:刘娟娟  夏有利
作者单位:浙江省永嘉县水利局,浙江永嘉,325100
摘    要:混凝土灌注桩是乌牛新闸工程的关键项目之一,工期紧,施工难度大。文中提出了该桩基施工的工艺流程及技术、管理措施,有针对性地解决了施工中可能存在的质量问题。

关 键 词:乌牛新闸  混凝土灌注桩  管理措施

Concrete Grouting Pile Construction Management Measures of Wuniu New Sluice
LIU Juan-juan,XIA You-li.Concrete Grouting Pile Construction Management Measures of Wuniu New Sluice[J].Journal of Changjiang Engineering Vocational College,2014,31(3):7-9.
Authors:LIU Juan-juan  XIA You-li
Institution:(Zhejiang Yongjia Water Resources Bureau, Yongjia 325100,China)
Abstract:Concrete grouting pile construction is the key program of Wuniu new sluice project, which has short construction period and big difficulty in construction. By analyzing the construction processes, technology and management measures of pile foundation, the quality problems that may exist in the construction has been solved.
Keywords:Wuniu new sluice  concrete grouting pile  management measures
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号