铁路35/10KV变配电所倒接开通方案论述
引用本文:何水龙.铁路35/10KV变配电所倒接开通方案论述[J].科技广场,2011(10):81-83.
作者姓名:何水龙
作者单位:中铁二十四局集团上海电务电化公司,浙江杭州,200070
摘    要:随着我国国民经济快速而持续的发展,对铁路的运输能力提出了更高的要求。由于铁路大提速和跨越式的发展,对铁路运输生产设备供电的安全可靠性提出了更高的要求,本文结合沪宁城际客运专线常州35/10KV变配电所倒接开通过程,在新老变配电所倒接期间如何对既有运行供电设备影响降到最低程度进行了分析。

关 键 词:整定值  系统图  应急预案

Railway 35/10KV Substation Swith Opening Overview
He Shuilong.Railway 35/10KV Substation Swith Opening Overview[J].Science Mosaic,2011(10):81-83.
Authors:He Shuilong
Institution:He Shuilong(Shanghai Electrification and Engineering Co.Ltd of NO.24 China Railway Group,Zhejiang Hanzhou 200070)
Abstract:With China's rapid and sustained economic development of the railway transport capacity of a higher demand.As the railway speed and leap-forward development of the railway transport safety and reliability of power supply equipment of a higher demand,this paper,Changzhou,Shanghai-Nanjing inter-city passenger line connected 35/10KV substation down the process of opening new take down the old substation during operation of existing power facilities to minimize the impact were analyzed.
Keywords:Setting Value  System Diagram  Emergency Plan  