首页 | 本学科首页   官方微博 | 高级检索  
     检索      

吉沙水电站引水隧洞上斜井段反井钻机施工
引用本文:何灏.吉沙水电站引水隧洞上斜井段反井钻机施工[J].长江工程职业技术学院学报,2006,23(3):52-53.
作者姓名:何灏
作者单位:长江水利委员会三峡工程监理部,湖北,宜昌,443133
摘    要:简述了反井钻机的工作特点及其在吉沙水电站工程的应用,给出了施工程序及质量保证措施.

关 键 词:反井钻机  斜井开挖  施工方法
文章编号:1673-0496(2006)03-0052-02
收稿时间:2006-04-15
修稿时间:2006年4月15日

Construction of Raising Drilling Rig for Upper Inclined Part of Diversion Tunnel of Jisha Power Station
HE Hao.Construction of Raising Drilling Rig for Upper Inclined Part of Diversion Tunnel of Jisha Power Station[J].Journal of Changjiang Engineering Vocational College,2006,23(3):52-53.
Authors:HE Hao
Institution:The Supervision Department of the Three Gorges Project of CWRC, Yichang, Hubei 443133, China
Abstract:The working traits of raising drilling fig and its application in Jisha Power Station are depicted briefly. Construction procedure and measures for quality guarantee are offered.
Keywords:raising drilling rig  slope excavation  construction technique
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号