首页 | 本学科首页   官方微博 | 高级检索  
     检索      

城市河道黑臭水体综合治理工程实例分析
引用本文:岳志芳,岳丽芳,陈勇,王家福,王彦隽,闫永利.城市河道黑臭水体综合治理工程实例分析[J].唐山学院学报,2022,35(3):67-70,82.
作者姓名:岳志芳  岳丽芳  陈勇  王家福  王彦隽  闫永利
作者单位:内蒙古农业大学 职业技术学院, 内蒙古 包头 014109;唐山学院 土木工程学院, 河北 唐山 063000;中国电建西北勘测设计研究院有限公司, 西安 710000;内蒙古自治区水利水电勘测设计院, 呼和浩特 010000
基金项目:内蒙古农业大学职业技术学院新农村发展建设科技创新团队项目(2017CX7D05)
摘    要:针对某市河道黑臭水体的特性及污染物特点,采用"膜生物反应器(MBR)一体化工艺、补氧+生物膜、人工清淤"综合治理技术对其进行治理。实际治理结果表明,MBR一体化工艺出水水质达到了《城市污水再生利用景观环境用水水质》(GB/T18921-2019)的要求;补氧与生物膜的组合应用最大程度地消除了黑臭现象;采用人工清淤方式对河床内淤泥进行了全部清除,消除了内源污染;工程运行费用为70.39万元/年。该综合治理技术治理河道黑臭水体效果良好,适合在其他类似项目中推广应用。

关 键 词:黑臭水体  膜生物反应器  补氧  载体生物膜  人工清淤

Analysis of Comprehensive Treatment Project for Heavily polluted Water Bodies in the Cities
YUE Zhi-fang,YUE Li-fang,CHEN Yong,WANG Jia-fu,WANG Yan-jun,YAN Yong-li.Analysis of Comprehensive Treatment Project for Heavily polluted Water Bodies in the Cities[J].Journal of Tangshan College,2022,35(3):67-70,82.
Authors:YUE Zhi-fang  YUE Li-fang  CHEN Yong  WANG Jia-fu  WANG Yan-jun  YAN Yong-li
Institution:Vocational and Technical College, Inner Mongolia Agricultural University, Baotou 014109, China;School of Civil Engineering, Tangshan University, Tangshan 063000, China;PowerChina Northwest Engineering Co. Ltd, Xi''an 710000, China;Water Conservancy and Hydropower Survey and Design Institute of Inner Mongolia Autonomous Region, Hohhot 010000, China
Abstract:According to the nature of heavily polluted water bodies and the characteristics of the pollutant in a city river course, the project in this paper has adopted the comprehensive treatment of "membrane bio-reactor (MBR) integrated technology, oxygen supplement plus carrier biofilm, and manual dredging". The results show that the effluent quality with the MBR integrated process meets the requirement in "The Reuse of Urban Recycling Water-Water Quality Standard for Scenic Environment Use" (GB/T18921-2019);Combined application of oxygen supplement and carrier biofilm has eliminated the blackness and odor in the polluted water to the greatest extent; All the sludge in the riverbed has been removed by manual dredging, The project expense is 703 900 yuan per year. In this project,the expected result has been achieved for the treatment of highly polluted water bodies by this comprehensive treatment technology, which also applies to the other similar projects.
Keywords:heavily polluted water bodies  membrane bio-reactor(MBR)  oxygen supplement  carrier biofilm  manual dredging
点击此处可从《唐山学院学报》浏览原始摘要信息
点击此处可从《唐山学院学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号