大岩洞隧道松散岩堆体施工技术 |
| |
引用本文: | 刘四新.大岩洞隧道松散岩堆体施工技术[J].石家庄铁路工程职业技术学院学报,2008(4):26-29. |
| |
作者姓名: | 刘四新 |
| |
作者单位: | 陕西铁路工程职业技术学院 |
| |
摘 要: | 结合大岩洞隧道施工,介绍大岩洞隧道出口松散岩堆体预加固处理及CRD法施工,提出不稳定岩堆体条件下隧道洞身施工方案和施工工艺。
|
关 键 词: | 松散岩堆体 CRD法施工 总体方案 施工工艺 |
Construction Techniques for Dayandong Tunnel of Loose Rock Pile |
| |
Authors: | Liu Sixin |
| |
Institution: | Shaanxi Institute of Railway Technology Weinan Shaanxi 714000 China |
| |
Abstract: | To introduceCRD construction method and pre-reinforcement to portal section of Dayandong tunnel in accumulative rock,construction of the overall plan and construction technology in unstable tunnel accumulated with porous surrounding rock have been brought forward. |
| |
Keywords: | loose rock CRD construction method overall programme construction technology |