首页 | 本学科首页   官方微博 | 高级检索  
     检索      

HVTC直流线路瞬时接地故障试验的设计与实施
引用本文:王少华,薛辉.HVTC直流线路瞬时接地故障试验的设计与实施[J].江西电力职业技术学院学报,2010,23(4).
作者姓名:王少华  薛辉
作者单位:华北电力大学;北京供电公司;
摘    要:阐述了高压直流输电工程直流线路瞬时接地故障试验的设计与实施,从试验目的和原理、试验设备、试验准备、试验操作、安全措施五个方面详细地讲解了如何去设计安排试验。

关 键 词:HVDC  瞬时接地试验  故障试验  试验设计

Design and Implemention of HVTC DC Transient Artificial Ground Fault Test
WANG Shao-hua,XUE Hui.Design and Implemention of HVTC DC Transient Artificial Ground Fault Test[J].Journal of Jiangxi Vocational and Technical College of Electricity,2010,23(4).
Authors:WANG Shao-hua  XUE Hui
Institution:WANG Shao-hua1,XUE Hui2 (1.North China Electric Power University Beijing 102206,2.Beijing Power Supply Company Beijing 102206,China)
Abstract:This article focuses on design and implementation of artificial ground fault about DC line transient test in HVDC project.It discusses how to design and implement in five sides: purpose of the experiment,preparation before test,test devices and composition of operation,and system recovery,and security measures.
Keywords:HVDC  transient artificial groundfault test  fault test  test design  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号